Friday, October 4, 2019
Surveying Processes Assignment Example | Topics and Well Written Essays - 2250 words
Surveying Processes - Assignment Example All the exterior walls are included when the surveyor is taking the foot print. Elevation is another common surveying term which refers to the height which is usually above sea level. This point usually describes the house which is to be constructed and how high is it from sea level. Site plan is a very common surveying term which includes all the dimensions; the site drainage is often the most important point when the site plan is being talked about. Monument refers to marking, a position is marked which is used for future reference Heading usually refers to direction which is magnetic and is determined with the help of a compass Tolerance refers to the precision of a measurement and it is a mathematical term which is very important when it comes to the process of surveying Architecture and trigonometry go hand in hand; it has several major uses when it comes to surveying sites and determining solutions to various arduous problems. The curving surfaces need perfect calculations only then one can build buildings, without the proper use of trigonometry these buildings would just fall after a few days. It is imperative to determine the proper height of a building and that is where trigonometry comes into play, creating dimensional objects also require the much needed assistance of trigonometry. The demarcations of cubicles can only be determined by the proper use of trigonometry, these cubicles are crucial in an office building. It also determines the no of people required to complete a task because it lays out a structure on which the construction workers work upon. Having accurate measurements gives a building its strength and this is unimaginable without the proper use of trigonometric ratios. The following will serve as a classic example to prove the above point: A surveyor who has been asked to lay out a design for a bridge goes and calculates the width of the river over which the bridge is to be constructed, the surveyor has to apply the sine and the cosine ratios to be able to calculate the width and lay out a proper design for the bridge to be constructed only then the workers can start the work. This is why trigonometry is extremely important and all the top constructions engineers are really good at mathematics. Common Surveying Equipment: The following section will comprehensively present the most common surveying equipment. Measuring Wheels: Measuring wheels are very widely used by surveyors to measure distance from one point to another. These measuring wheels become all the more important when the surveyor is in a hurry; they are employed when distance is to be measured in a hurry. These measuring wheels come in different shapes and sizes, the small wheel is employed for indoor measurement, the medium wheel is perhaps the best as it can used both indoor as well as outdoor and lastly there is a large wheel which can be used only for outdoor purposes. Compasses and Clinometers: Slope readings, sight directions and height readings become easier to take with the help of compasses and clinometers. Brush Axes: Brush axes are mainly used to clear the area which is blocking the line-of-sight; it is always good to carry extra axes just in case the surveyor breaks his axes. Automatic Levels: Automatic levels are great tools
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.